Lift Analysis
  • As Fabrication is done On-shore
  • Lifting becomes the most important operation
  • Installations weigh from 1,000 – 35,000 MT But
    Average lift capacities – 3000 MT
  • Therefore Modular construction of the facilities
    Weighing up to 2,000 MT
  • Following verifications are inherent to this analysis:
    - Module main frame Strength during LIFT
    - All lift points connected to crane hooks with the slings
    - Pad-eye Design & Shackle Selection