Sr. No. | Project | CEG Scope | Period | Water Depth |
---|---|---|---|---|
1 | Chandrika and GS49 Fields Krishna Godavari Offshore, East Coast - ONGC | Technical Appraisal and CAPEX vetting of ONGC's Chandrika Field. Development
consists of Seven (7) development wells, 83 km of submarine pipelines and 82 km of
Umbilicals. Development strategy envisages well completion by using mud line trees
(MLT). Mudline Trees are connected to subsea Manifold/TIS via 10" and 8" flow lines
with FLET's and ILTS. From Subsea manifold/TIS, 20" export line is connected to OOT.
Development is proposed by deploying SURF concept, i.e., Subsea Umbilicals, Risers and Flowlines |
2024 | 10 - 22 m |
2 | B-37 Block (DSF III and Neelam PML), Neelam and Heera Asset, Western Offshore - ONGC | Technical Appraisal and CAPEX vetting of ONGC's B 37 Block Development comprising of DSF III and Neelam PML. The Project envisaged 8 new development wells, One (1) new well platform NLM 14, 18 km of submarine pipeline and modification to existing facilities. | 2024 | 70 m |
3 | Southern Part of Bassien Field. Bassien and Satellite Asset, Western Offshore | Technical Appraisal and CAPEX vetting of ONGC's SouthBassien Field additional Development Plan. The Project envisaged 4 new development wells, One (1) new well platform, 8 km of submarine pipeline and modification to existing facitities. | 2024 | 70 m |
4 | Mukta Field Development Phase V. Bassein and Satellite Assets, Western Offshore | Technical Appraisal and CAPEX vetting of ONGC's Mukta Field under Phase V Development Plan. The Project envisaged 13 new development wells, Three (3) new well platform, 68 km of submarine pipeline and modification to existing facitities. | 2024 | 65 m |
5 | Geleki Field Redevelopment IOR | Appraisal of production profile, facilities upgradation, IOR and CAPEX for Geleki Field of ONGC in Assam | 2023 | Onshore |
7 | CSU Replacement | Appraisal of total replacement of 5 units of CSU and installation of new units for 25 years of design life to cater to the changing operating scenarios like higher H2S content, higher water cut etc. in the Feed Crude. | 2022 | Onshore |
8 | Pipeline Replacement Project 7 | Technical Appraisal and CAPEX vetting of ONGC's Pipeline replacement Project 7. Project envisaged replacement of existing submarine pipelines and platform modifications. A total of about 167 km of submarine pipelines are envisaged to be replaced under this project. Also, about 126 km of new pipelines were envisaged. Modification to 50 existing platforms was included. | 2021 | Varies 50 - 80 m |
9 | Pipeline Replacement Project VI | Technical Appraisal and CAPEX vetting of ONGC's Pipeline replacement Project (VI). Project envisaged replacement of existing submarine pipelines and platform modifications. A total of about 102 km of submarine pipelines are envisaged to be replaced under this project. | 2019 | Varies 50 - 80 m |
10 | MHN Redevelopment Phase IV | Technical Appraisal and CAPEX vetting of ONGC's ΜΗΝ Redevelopment Project Phase IV under partnership with KPMG. SOW included review and vetting of production profile from aging fields and addition of a new Living Quarter Platform for 120 persons. Power generation (GT driven) and a new flare is also envisaged as a part of redevelopment. Revamping / refurbishment of old facilities is also included under the scope. | 2019 | |
11 | Coal Bed Methane Field Development - Jharia | Technical Appraisal and CAPEX vetting of ONGC's Coal Bed Methane (CBM) field development plan for Jharia asset. SOW envisaged review and vetting of production profile, well drilling activity and facility development plan. A total of 60 new wells are to be drilled as a part of development plan. 94 km of CS pipelines are proposed to be laid for transportation of well fluid to processing stations. HDPE pipelines are envisaged for transportation of produced water. Two Gas Collections Centers are proposed comprising of facilities such as separation, compression dehydrations, water conditioning, flare etc. | 2019 | |
12 | Pipeline Replacement Project V | Technical Appraisal and CAPEX vetting of ONGC's Pipeline replacement Project (V). Project envisaged replacement of existing submarine pipelines and platform modifications. A total of about 60 km of submarine pipelines are envisaged to be replaced under this project. | 2018 | |
13 | Acquisition of Onshore Rigs | Technical Appraisal and CAPEX vetting of ONGC's onshore drilling rig acquisition plan. A total of 27 drilling rigs and 20 work over rigs are envisaged to be acquired. | 2017 - 18 |
Sr. No. | Project | Owner | Client | CEG Scope | Period |
---|---|---|---|---|---|
1 | Gas Processing Plant Technical Appraisal |
GAIL | KPMG | Identification of profitability maximization measures while leveraging advanced data analytics wherever possible in GAIL's Gas Processing Units. Areas of study cover process improvements, improved revenue levels, reduced OPEX etc. | 2024 |
2 | Strategic Storage Plan for Crude Oil - Manmade Caverns 35 m below ground level. | ISPRL | KPMG / ONGC | Building a Strategic Petroleum Reserve of 2.5 Million Ton capacity at Padur in Karnataka. The storage shall be about 35 m below ground level comprising of man-made caverns. Scope included technical review of ISPRL tender documents and independent CAPEX estimate for the project. | 2024 |
3 | LNG Bharat Technical / CAPEX Appraisal | LNG Bharat | KPMG | Appraisal of reserve potential, production profile, facilities and CAPEX for 13 fields awarded to LNG Bharat for enhanced recovery and DSF. | 2023 |
4 | KPI Benchmarking Technical Advisory | GAIL | KPMG | Technical Advisory to KPMG for ongoing KPI benchmarking study for GAIL. The scope included all the Natural Gas and LPG pipelines of GAIL in additions to Gas Processing units at Vijaipur, Vaghodia and Gandhar. | 2019 |
Sr. No. | Project | CEG Scope | Period | Water Depth |
---|---|---|---|---|
1 | Heera Redevelopment Project 3 | Technical Appraisal and CAPEX vetting of ONGC’s Heera Redevelopment Project 3. Project envisaged additional facilities such as development wells (13 Oil + 5 WI), two new well head platforms, 38 km of submarine pipelines, platform modification etc. | 2019 | 55m |
2 | Cluster 7 Redevelopment Project | Technical Appraisal and CAPEX vetting of ONGC’s Cluster 7 Redevelopment Project. Project envisaged additional facilities such as well head platforms, riser platform, submarine pipelines, platform modification, CO2 mitigation membrane implementation etc. | 2019 | 60 - 70 m |
Sr. No. | Project | CEG Scope | Period | Water Depth |
---|---|---|---|---|
1 | KG - D6 Field Development - Arbitration with RIL Technical Advisory |
Technical advisory to Director General – Hydrocarbons (GOI) in the matter of Arbitration of Krishna Godavari D6 PSC with RIL. Scope includes technical review of claims made by opposing parties and to advise on validity of the same against provisions of PSC and industry practice. To provide expert technical opinion to support governments claim. | 2020 | 700 - 2400m |
2 | Panna - Mukta - Tapti Arbitration Technical Advisory |
Technical advisory to Director General – Hydrocarbons (GOI) in the matter of Arbitration of Panna – Mukta – Tapti PSC with RIL and BG. Scope includes technical review of claims made by opposing parties and to advise on validity of the same against provisions of PSC and industry practice. | 2019 | 60 - 70 m |
Project | CEG Scope |
---|---|
Green Ammonia Technical / CAPEX Appraisal KPMG ONGC / Greenco 2020 |
Appraisal of pre-feasibility of setting up 3000 MT per day Green Ammonia Plant for ONGC on East Coast. The electricity generated from the renewable energy sources is fed to the power grid and corresponding electric power will be drawn continuously from the grid by the ammonia complex so that the total electricity required is drawn in a continuous basis. The project consists of green ammonia plant based on green Hydrogen and green nitrogen as basic raw materials. The production of green Hydrogen through electrolysis uses renewable power sourced from combination of solar and wind power along with energy storage to deliver Round the Clock renewable power. |
Sr. No. | Project | Owner | Client | Modules | CEG Scope | Period | Water Depth |
---|---|---|---|---|---|---|---|
1 | LEWPP 1 and 2 Project of ONGC | ONGC | Triune | Detail Engineering | Setting up Project and Engineering Teams for detail engineering of Life Extension for more than 30 platforms of ONGC | 2016 | 50 - 70 m |
2 | Panipat Refinery | IOCL | Triune | Detail Engineering | Design and detail engineering for 1 No Horton Sphere and 1 no Mounted Bullet at C4 MIX / C4 Raffinate / C4H Storage facilities at IOCL Panipat Refinery | 2016 | |
3 | MAA Refinery, Kuwait | KNPC | Triune | Piping Engineering | Detail Engineering for Piping Stress Analysis for Emergency Isolation valves for GAS Plants and FCC Units at MAA refinery | 2014 - 17 | |
4 | Ratawi Platforms Revamp | Saudi Aramco | PLL | Structural Engineering | Engineering assistance for design of deck extensions on Ratawi platform. | 2013 | 30 m |
5 | Bukoba and Sembawang Projects | Tanzanian Govt | Technofab | Structural Engineering | Detailed Engineering / drawings for Plants at Bukoba and Sembawang's. | 2013 - 15 | |
6 | B 12 A and C Series Platforms | ONGC | Saipem India Ltd | Structural Engineering | Assistance to Client for carrying out In place and Seismic Analysis for all the four platforms. | 2013 | 20 - 55 m |
7 | Faroozan Field Development | NIOC | Triune | Structural Engineering | Spectral Fatigue for FZA Process and FYA Living Quarter Platforms. This included fatigue life assessment for pile also including fatigue induced during pile driving operation. | 2012 - 13 | > 70 m |
8 | Upper Zakum Facilities - Upgrade Project | ZADCO | SNC Lavlin | Design Review | Review of all in-service analyses for Central Processing Complex (2 platforms) for upgrade of facilities. All specifications and in-service analyses performed by SNC Lavlin were reviewed and approved before submission to Client. | 2012 | 15 m |
9 | HRD Process Platform | ONGC | SEW / SHI | HRD Deck, Jacket, Piles, Appurtenances and HRD - HRC bridge | Complete conceptual structural design for HRD Process Platform. Preliminary structural sizing for Jacket, Deck, piles and HRD - HRC bridge was carried out as pre-order activities. Complete Drawings and MTOs were prepared. | 2012 | 54 m |
10 | Sagar Samrat MOPU | ONGC | SHI | Topsides Modules | Working on complete structural detail engineering for the Flare Tower Module, Duct Support Module for PGC and Duct Support Module for TG. | 2012 | |
11 | Jordbear FPSO | Teekay Petrojar | SHI | Topsides Modules | Working on various in-service and pre-service analysis including development of drawings for various modules jointly with SHI | 2011 - 12 | |
12 | Ichthys Gas Field Development Project | INPEX, Australia | Saipem Indonesia | Riser Support Structure (RSS) | RSS is a Jacket-like substructure is to be used as the mid depth support structure; for the risers. RSS is proposed to elevate the risers to 110m above the seabed. Total water depth was around 200 m. RSS will be a Steel Jacket Structure, supporting twenty-five flexible risers and dynamic umbilicals by individual arches on it and anchored via clamp, at the mid-water. The RSS has an overall height of 110 m and has a gravity foundation. carried out complete in-survive analysis including dynamic and seismic evaluation of the structure. Pre-service analysis were also carried out. | 2010 - 12 | 250 m |
13 | Zawtika Development Project - Phase IA | Myanmar Oil and Gas Enterprise | LTV | WP 1, WP 2 and WP 3 Jackets | Spectral Fatigue for WP 1 Jacket and Transportation analysis for piles for three Jackets. | 2011 - 12 | 139 m |
14 | Block A 18 - Surya B | Carigali Hess Operating Company Sdn Bhd | Saipem Indonesia | SYB Jacket | Engineering for Installation including on-bottom stability, lifting, and double hook upending. | 2010 - 11 | 56 m |
15 | Bukit Tua Field Development | P C Ketapan II Ltd. | Saipem Indonesia | WHP | Structural analysis for Well Head Platform was carried out as pre-order activities. | 2010 - 11 | 57 m |
16 | Ruby Field Development | Pearl Oil, Vietnam | Saipem Indonesia | WHP and PQP Platform Jackets | Structural analysis for Well Head Jacket and Process / LQ Jacket was carried out as pre-order activities. Complete Drawings and MTOs were finalized. | 2010 | 60 m |
17 | B and N series Platforms | ONGC | Saipem Indonesia | B 48 and N 16 Jackets | CEG carried out pre-order engineering for these two Jackets. All in-service and pre-service analysis were performed, and drawings were developed. | 2010 | 70 - 80 m |
18 | Field A | ENI Indonesia | Saipem Indonesia | NBP Platform | This platform is located north of Sumatra in Indonesian waters with water depth of 108 m. CEG carried out pre-bid engineering for this platform which included In-place, spectral fatigue and lift analysis. Concept drawings were developed and submitted to the Client. | 2010 - 11 | 108 m |
19 | Topaz Field Dev. | Petronas Carigali Vietnam Ltd. | Saipem Indonesia | TPDP- A Jacket | Carried out engineering for installation. Scope included Transportation and Lift analysis (for jacket and topsides). Floatation, Upending and on-bottom stability analyses for jacket. | 2009 - 10 | 41 m |
20 | OGIP Project | ONGC | Kevin / Naftogaz | Modification to 26 well platforms and 5 process platforms | Complete Detail Engineering for addition of J Tubes on 26 existing well platforms and 5 process platforms. Scope also included complete detail structural and architectural engineering for new EI Houses and deck extension of 19 well platforms. CEG team carried out offshore surveys for collection of information. | 2008 - 09 | 50 - 70 m |
21 | NQRC, MHN, B 193 and Heera WPs | ONGC | PLL | Pre bid engineering for NQRC, MHN and B 193. | Conceptual design of Jackets / Piles and Topsides including preliminary In-place analysis, MTO and drawings for B 193 and MHN. Review of Jacket configuration selection for Heera Jackets by PLL | 2007 - 08 | 50 - 70 m |
22 | IA, HA and BD Platforms | Maersk Oil Qatar | NPCC | Jackets, access decks, Piles and appurtenances for all three platforms | Complete structural detail engineering for Access Deck, Jacket, Piles and Appurtenances including all in-service / pre-service analysis, AFC drawings, Specifications, WCR and MTOs. | 2006 - 07 | 70 m |
23 | SLQ and NLQ Platform in Souroush & Nowrooz Fields | Shell Exploration BV | Shell Exploration BV | Telecom Towers | Re-assessment of Telecom towers for additional antennas. | 2006 | NA |
24 | 9 Well Platform Project | ONGC | KPGI / L&T | RS1, RS2, RS3, RS5, RS8 and ZB well platforms | Various analysis were performed to assist KPGI in meeting targets. Analysis included In place, Floatation / Upending, Fatigue, Launch, seafastening design. | 2004 - 05 | 60 - 80 m |
25 | LA / LB Well Platforms - Lakshmi Field | Cairns India | Technip KTI | LA and LB Well Platforms | Complete structural engineering for modifications of LA and LB well platforms including re-assessment of integrity after modifications. Fatigue life was also re-assessed. | 2004 - 05 | 30 - 40 m |
26 | Gas Injection Platform | Banduq Oil Company | KPGI / L&T | Complete Process Platform Deck, Jacket, Piles and Appurtenances - 6 legged | Complete structural detail engineering for Topsides, Jacket, Piles and Appurtenances including all in-service / pre-service analysis, AFC drawings, Specifications, WCR and MTOs. | 2004 - 05 | 18 m |
27 | BH - N09 Well Platform | Qatar Petroleum | NPCC | Complete Well Platform Deck with helideck, Jacket, Piles and Appurtenances - 4 legged | Complete structural detail engineering for Topsides, Jacket, Piles and Appurtenances including all in-service / pre-service analysis, AFC drawings, Specifications, WCR and MTOs. | 2003 - 04 | 27 m |
28 | Souroosh and Nowrooz Field Development | Shell Iran | NPCC | SLQ and NLQ Living Quarter Platforms | Detailed Analysis including In-place, Seismic, Load-out, Lift and Transportation for SLQ and NLQ Topsides. | 2003 - 04 | 50 m |
We are pleased to introduce ourselves as a group of seasoned professionals, providing Technical Evaluation and Vetting of Energy Projects, Oil & Gas & Renewables including Analysis and Design of Complex Offshore Facilities.
10-A Sikka M K House
Veer Savarkar Block, Shakarpur
New Delhi - 110092
© All Rights Reserved by Core Engineering Group.
Designed By Mirackle Solutions