References


Engagements with KPMG / ONGC


Sr. No. Project CEG Scope Period Water Depth
1 Chandrika and GS49 Fields Krishna Godavari Offshore, East Coast - ONGC Technical Appraisal and CAPEX vetting of ONGC's Chandrika Field. Development consists of Seven (7) development wells, 83 km of submarine pipelines and 82 km of Umbilicals. Development strategy envisages well completion by using mud line trees (MLT). Mudline Trees are connected to subsea Manifold/TIS via 10" and 8" flow lines with FLET's and ILTS. From Subsea manifold/TIS, 20" export line is connected to OOT.

Development is proposed by deploying SURF concept, i.e., Subsea Umbilicals, Risers and Flowlines
2024 10 - 22 m
2 B-37 Block (DSF III and Neelam PML), Neelam and Heera Asset, Western Offshore - ONGC Technical Appraisal and CAPEX vetting of ONGC's B 37 Block Development comprising of DSF III and Neelam PML. The Project envisaged 8 new development wells, One (1) new well platform NLM 14, 18 km of submarine pipeline and modification to existing facilities. 2024 70 m
3 Southern Part of Bassien Field. Bassien and Satellite Asset, Western Offshore Technical Appraisal and CAPEX vetting of ONGC's SouthBassien Field additional Development Plan. The Project envisaged 4 new development wells, One (1) new well platform, 8 km of submarine pipeline and modification to existing facitities. 2024 70 m
4 Mukta Field Development Phase V. Bassein and Satellite Assets, Western Offshore Technical Appraisal and CAPEX vetting of ONGC's Mukta Field under Phase V Development Plan. The Project envisaged 13 new development wells, Three (3) new well platform, 68 km of submarine pipeline and modification to existing facitities. 2024 65 m
5 Geleki Field Redevelopment IOR Appraisal of production profile, facilities upgradation, IOR and CAPEX for Geleki Field of ONGC in Assam 2023 Onshore
7 CSU Replacement Appraisal of total replacement of 5 units of CSU and installation of new units for 25 years of design life to cater to the changing operating scenarios like higher H2S content, higher water cut etc. in the Feed Crude. 2022 Onshore
8 Pipeline Replacement Project 7 Technical Appraisal and CAPEX vetting of ONGC's Pipeline replacement Project 7. Project envisaged replacement of existing submarine pipelines and platform modifications. A total of about 167 km of submarine pipelines are envisaged to be replaced under this project. Also, about 126 km of new pipelines were envisaged. Modification to 50 existing platforms was included. 2021 Varies 50 - 80 m
9 Pipeline Replacement Project VI Technical Appraisal and CAPEX vetting of ONGC's Pipeline replacement Project (VI). Project envisaged replacement of existing submarine pipelines and platform modifications. A total of about 102 km of submarine pipelines are envisaged to be replaced under this project. 2019 Varies 50 - 80 m
10 MHN Redevelopment Phase IV Technical Appraisal and CAPEX vetting of ONGC's ΜΗΝ Redevelopment Project Phase IV under partnership with KPMG. SOW included review and vetting of production profile from aging fields and addition of a new Living Quarter Platform for 120 persons. Power generation (GT driven) and a new flare is also envisaged as a part of redevelopment. Revamping / refurbishment of old facilities is also included under the scope. 2019
11 Coal Bed Methane Field Development - Jharia Technical Appraisal and CAPEX vetting of ONGC's Coal Bed Methane (CBM) field development plan for Jharia asset. SOW envisaged review and vetting of production profile, well drilling activity and facility development plan. A total of 60 new wells are to be drilled as a part of development plan. 94 km of CS pipelines are proposed to be laid for transportation of well fluid to processing stations. HDPE pipelines are envisaged for transportation of produced water. Two Gas Collections Centers are proposed comprising of facilities such as separation, compression dehydrations, water conditioning, flare etc. 2019
12 Pipeline Replacement Project V Technical Appraisal and CAPEX vetting of ONGC's Pipeline replacement Project (V). Project envisaged replacement of existing submarine pipelines and platform modifications. A total of about 60 km of submarine pipelines are envisaged to be replaced under this project. 2018
13 Acquisition of Onshore Rigs Technical Appraisal and CAPEX vetting of ONGC's onshore drilling rig acquisition plan. A total of 27 drilling rigs and 20 work over rigs are envisaged to be acquired. 2017 - 18




Engagements with KPMG / GAIL / OTHERS


Sr. No. Project Owner Client CEG Scope Period
1 Gas Processing Plant

Technical Appraisal
GAIL KPMG Identification of profitability maximization measures while leveraging advanced data analytics wherever possible in GAIL's Gas Processing Units. Areas of study cover process improvements, improved revenue levels, reduced OPEX etc. 2024
2 Strategic Storage Plan for Crude Oil - Manmade Caverns 35 m below ground level. ISPRL KPMG / ONGC Building a Strategic Petroleum Reserve of 2.5 Million Ton capacity at Padur in Karnataka. The storage shall be about 35 m below ground level comprising of man-made caverns. Scope included technical review of ISPRL tender documents and independent CAPEX estimate for the project. 2024
3 LNG Bharat Technical / CAPEX Appraisal LNG Bharat KPMG Appraisal of reserve potential, production profile, facilities and CAPEX for 13 fields awarded to LNG Bharat for enhanced recovery and DSF. 2023
4 KPI Benchmarking Technical Advisory GAIL KPMG Technical Advisory to KPMG for ongoing KPI benchmarking study for GAIL. The scope included all the Natural Gas and LPG pipelines of GAIL in additions to Gas Processing units at Vijaipur, Vaghodia and Gandhar. 2019




Engagements with Deloitte / ONGC


Sr. No. Project CEG Scope Period Water Depth
1 Heera Redevelopment Project 3 Technical Appraisal and CAPEX vetting of ONGC’s Heera Redevelopment Project 3. Project envisaged additional facilities such as development wells (13 Oil + 5 WI), two new well head platforms, 38 km of submarine pipelines, platform modification etc. 2019 55m
2 Cluster 7 Redevelopment Project Technical Appraisal and CAPEX vetting of ONGC’s Cluster 7 Redevelopment Project. Project envisaged additional facilities such as well head platforms, riser platform, submarine pipelines, platform modification, CO2 mitigation membrane implementation etc. 2019 60 - 70 m




Engagements with DGH - GOI


Sr. No. Project CEG Scope Period Water Depth
1 KG - D6 Field Development - Arbitration with RIL

Technical Advisory
Technical advisory to Director General – Hydrocarbons (GOI) in the matter of Arbitration of Krishna Godavari D6 PSC with RIL. Scope includes technical review of claims made by opposing parties and to advise on validity of the same against provisions of PSC and industry practice. To provide expert technical opinion to support governments claim. 2020 700 - 2400m
2 Panna - Mukta - Tapti Arbitration

Technical Advisory
Technical advisory to Director General – Hydrocarbons (GOI) in the matter of Arbitration of Panna – Mukta – Tapti PSC with RIL and BG. Scope includes technical review of claims made by opposing parties and to advise on validity of the same against provisions of PSC and industry practice. 2019 60 - 70 m




Engagements for Green H 2 > NH 3


Project CEG Scope
Green Ammonia

Technical / CAPEX Appraisal

KPMG

ONGC / Greenco

2020
Appraisal of pre-feasibility of setting up 3000 MT per day Green Ammonia Plant for ONGC on East Coast. The electricity generated from the renewable energy sources is fed to the power grid and corresponding electric power will be drawn continuously from the grid by the ammonia complex so that the total electricity required is drawn in a continuous basis. The project consists of green ammonia plant based on green Hydrogen and green nitrogen as basic raw materials. The production of green Hydrogen through electrolysis uses renewable power sourced from combination of solar and wind power along with energy storage to deliver Round the Clock renewable power.



Detail Engineering


Sr. No. Project Owner Client Modules CEG Scope Period Water Depth
1 LEWPP 1 and 2 Project of ONGC ONGC Triune Detail Engineering Setting up Project and Engineering Teams for detail engineering of Life Extension for more than 30 platforms of ONGC 2016 50 - 70 m
2 Panipat Refinery IOCL Triune Detail Engineering Design and detail engineering for 1 No Horton Sphere and 1 no Mounted Bullet at C4 MIX / C4 Raffinate / C4H Storage facilities at IOCL Panipat Refinery 2016
3 MAA Refinery, Kuwait KNPC Triune Piping Engineering Detail Engineering for Piping Stress Analysis for Emergency Isolation valves for GAS Plants and FCC Units at MAA refinery 2014 - 17
4 Ratawi Platforms Revamp Saudi Aramco PLL Structural Engineering Engineering assistance for design of deck extensions on Ratawi platform. 2013 30 m
5 Bukoba and Sembawang Projects Tanzanian Govt Technofab Structural Engineering Detailed Engineering / drawings for Plants at Bukoba and Sembawang's. 2013 - 15
6 B 12 A and C Series Platforms ONGC Saipem India Ltd Structural Engineering Assistance to Client for carrying out In place and Seismic Analysis for all the four platforms. 2013 20 - 55 m
7 Faroozan Field Development NIOC Triune Structural Engineering Spectral Fatigue for FZA Process and FYA Living Quarter Platforms. This included fatigue life assessment for pile also including fatigue induced during pile driving operation. 2012 - 13 > 70 m
8 Upper Zakum Facilities - Upgrade Project ZADCO SNC Lavlin Design Review Review of all in-service analyses for Central Processing Complex (2 platforms) for upgrade of facilities. All specifications and in-service analyses performed by SNC Lavlin were reviewed and approved before submission to Client. 2012 15 m
9 HRD Process Platform ONGC SEW / SHI HRD Deck, Jacket, Piles, Appurtenances and HRD - HRC bridge Complete conceptual structural design for HRD Process Platform. Preliminary structural sizing for Jacket, Deck, piles and HRD - HRC bridge was carried out as pre-order activities. Complete Drawings and MTOs were prepared. 2012 54 m
10 Sagar Samrat MOPU ONGC SHI Topsides Modules Working on complete structural detail engineering for the Flare Tower Module, Duct Support Module for PGC and Duct Support Module for TG. 2012
11 Jordbear FPSO Teekay Petrojar SHI Topsides Modules Working on various in-service and pre-service analysis including development of drawings for various modules jointly with SHI 2011 - 12
12 Ichthys Gas Field Development Project INPEX, Australia Saipem Indonesia Riser Support Structure (RSS) RSS is a Jacket-like substructure is to be used as the mid depth support structure; for the risers. RSS is proposed to elevate the risers to 110m above the seabed. Total water depth was around 200 m. RSS will be a Steel Jacket Structure, supporting twenty-five flexible risers and dynamic umbilicals by individual arches on it and anchored via clamp, at the mid-water. The RSS has an overall height of 110 m and has a gravity foundation. carried out complete in-survive analysis including dynamic and seismic evaluation of the structure. Pre-service analysis were also carried out. 2010 - 12 250 m
13 Zawtika Development Project - Phase IA Myanmar Oil and Gas Enterprise LTV WP 1, WP 2 and WP 3 Jackets Spectral Fatigue for WP 1 Jacket and Transportation analysis for piles for three Jackets. 2011 - 12 139 m
14 Block A 18 - Surya B Carigali Hess Operating Company Sdn Bhd Saipem Indonesia SYB Jacket Engineering for Installation including on-bottom stability, lifting, and double hook upending. 2010 - 11 56 m
15 Bukit Tua Field Development P C Ketapan II Ltd. Saipem Indonesia WHP Structural analysis for Well Head Platform was carried out as pre-order activities. 2010 - 11 57 m
16 Ruby Field Development Pearl Oil, Vietnam Saipem Indonesia WHP and PQP Platform Jackets Structural analysis for Well Head Jacket and Process / LQ Jacket was carried out as pre-order activities. Complete Drawings and MTOs were finalized. 2010 60 m
17 B and N series Platforms ONGC Saipem Indonesia B 48 and N 16 Jackets CEG carried out pre-order engineering for these two Jackets. All in-service and pre-service analysis were performed, and drawings were developed. 2010 70 - 80 m
18 Field A ENI Indonesia Saipem Indonesia NBP Platform This platform is located north of Sumatra in Indonesian waters with water depth of 108 m. CEG carried out pre-bid engineering for this platform which included In-place, spectral fatigue and lift analysis. Concept drawings were developed and submitted to the Client. 2010 - 11 108 m
19 Topaz Field Dev. Petronas Carigali Vietnam Ltd. Saipem Indonesia TPDP- A Jacket Carried out engineering for installation. Scope included Transportation and Lift analysis (for jacket and topsides). Floatation, Upending and on-bottom stability analyses for jacket. 2009 - 10 41 m
20 OGIP Project ONGC Kevin / Naftogaz Modification to 26 well platforms and 5 process platforms Complete Detail Engineering for addition of J Tubes on 26 existing well platforms and 5 process platforms. Scope also included complete detail structural and architectural engineering for new EI Houses and deck extension of 19 well platforms. CEG team carried out offshore surveys for collection of information. 2008 - 09 50 - 70 m
21 NQRC, MHN, B 193 and Heera WPs ONGC PLL Pre bid engineering for NQRC, MHN and B 193. Conceptual design of Jackets / Piles and Topsides including preliminary In-place analysis, MTO and drawings for B 193 and MHN. Review of Jacket configuration selection for Heera Jackets by PLL 2007 - 08 50 - 70 m
22 IA, HA and BD Platforms Maersk Oil Qatar NPCC Jackets, access decks, Piles and appurtenances for all three platforms Complete structural detail engineering for Access Deck, Jacket, Piles and Appurtenances including all in-service / pre-service analysis, AFC drawings, Specifications, WCR and MTOs. 2006 - 07 70 m
23 SLQ and NLQ Platform in Souroush & Nowrooz Fields Shell Exploration BV Shell Exploration BV Telecom Towers Re-assessment of Telecom towers for additional antennas. 2006 NA
24 9 Well Platform Project ONGC KPGI / L&T RS1, RS2, RS3, RS5, RS8 and ZB well platforms Various analysis were performed to assist KPGI in meeting targets. Analysis included In place, Floatation / Upending, Fatigue, Launch, seafastening design. 2004 - 05 60 - 80 m
25 LA / LB Well Platforms - Lakshmi Field Cairns India Technip KTI LA and LB Well Platforms Complete structural engineering for modifications of LA and LB well platforms including re-assessment of integrity after modifications. Fatigue life was also re-assessed. 2004 - 05 30 - 40 m
26 Gas Injection Platform Banduq Oil Company KPGI / L&T Complete Process Platform Deck, Jacket, Piles and Appurtenances - 6 legged Complete structural detail engineering for Topsides, Jacket, Piles and Appurtenances including all in-service / pre-service analysis, AFC drawings, Specifications, WCR and MTOs. 2004 - 05 18 m
27 BH - N09 Well Platform Qatar Petroleum NPCC Complete Well Platform Deck with helideck, Jacket, Piles and Appurtenances - 4 legged Complete structural detail engineering for Topsides, Jacket, Piles and Appurtenances including all in-service / pre-service analysis, AFC drawings, Specifications, WCR and MTOs. 2003 - 04 27 m
28 Souroosh and Nowrooz Field Development Shell Iran NPCC SLQ and NLQ Living Quarter Platforms Detailed Analysis including In-place, Seismic, Load-out, Lift and Transportation for SLQ and NLQ Topsides. 2003 - 04 50 m



We are pleased to introduce ourselves as a group of seasoned professionals, providing Technical Evaluation and Vetting of Energy Projects, Oil & Gas & Renewables including Analysis and Design of Complex Offshore Facilities.


CONTACT US

Core Engineering Group

10-A Sikka M K House
Veer Savarkar Block, Shakarpur
New Delhi - 110092


[email protected]

Map


© All Rights Reserved by Core Engineering Group.

Designed By Mirackle Solutions